Optimal stopping and restarting production times for an EOQ model with deteriorating items and time-dependent partial backlogging

Loading...
Thumbnail Image

Date

Authors

Skouri, K.
Papachristos, S.

Journal Title

Journal ISSN

Volume Title

Publisher

Elsevier

Abstract

Type of the conference item

Journal type

peer reviewed

Educational material type

Conference Name

Journal name

International Journal of Production Economics

Book name

Book series

Book edition

Alternative title / Subtitle

Description

Yan and Cheng (J. Operational Res. Soc. 49 (1998), 1288-1295) presented a general production-inventory model with production rate, product demand rate and deterioration rate, all considered as functions of the time. Their model allows for shortages and partial backlogging of the unsatisfied demand at a constant rate. In this paper, we extend the results of Yan and Cheng to cover the case where the backlogging rate is a time-dependent function and we propose an algorithm for the solution of this problem. We also propose some conditions which we believe to be necessary for the validity for some of Yan's and Cheng's statements. The paper closes with numerical examples which cover each one of the cases considered in the paper. (C) 2002 Elsevier Science B.V. All rights reserved.

Description

Keywords

production, demand, deterioration, partial time-depended backlogging

Subject classification

Citation

Link

<Go to ISI>://000180100000048

Language

en

Publishing department/division

Advisor name

Examining committee

General Description / Additional Comments

Institution and School/Department of submitter

Πανεπιστήμιο Ιωαννίνων. Σχολή Θετικών Επιστημών. Τμήμα Μαθηματικών

Table of contents

Sponsor

Bibliographic citation

Name(s) of contributor(s)

Number of Pages

Course details

Endorsement

Review

Supplemented By

Referenced By